Tuesday, January 29, 2008

Cedar Kayak - Day 6



My cove & bead bits arrived on Tuesday, so I began running the strips through the router. The strips are very narrow (1/4" x 3/4") which means I have to be very precise on the router setup.





I also decided that I will start with Redwood down the sheer line on my first strip. This will make a nice deep red line where the hull and the deck meet. I spent another hour selecting and cutting strips and redwood. I only had 10 foot boards of Redwood. I will have to splice two strips together to get enough length to cover the length of the boat (17ft).






Project Elapsed Time : 22.5 Hrs



No comments: